Reconstruction of previously delivered paint shop technological equipments
|
Equipment technical status snapping |
 |
|
|
|
Draft of measures |
-
detecting protocol is a basis of a draft of measures, the wiring system revision (periodical) is its separate part
-
draft of measures is elaborated with consideration of provision NV no. 406/2004 Sb. ČSN EN 12 215 ČSN EN 13 355 and related regulations in an air protection section
|
 |
|
Realization offer |
-
offer for production delivery of equipment parts for reconstruction
-
reconstruction procedure setting, realization terms
|